台湾打真军未删电影完整版|久久99国产精品久久99大师|欧洲精品色|男人先锋资源,国产在线观看xxx,活着电视剧在线观看免费观看完整版 ,日本视频精品

First major tunnel over 5,000 meters drilled through along China-Laos railway

Source: Xinhua| 2019-03-21 12:51:40|Editor: xuxin
Video PlayerClose

LAOS-BOTEN-CHINA-RAILWAY-TUNNEL

Constructors and local Lao residents attend the drilling-through ceremony of Boten Tunnel along the China-Laos railway in Boten of Laos, March 21, 2019. A Chinese railway engineering company on Thursday drilled through Boten Tunnel, the first major tunnel over 5,000 meters along the China-Laos railway. This marks an important milestone in the construction of the project. The Boten Tunnel, with a length of 6453.5 meters, is among the 10 major tunnels longer than five km along the China-Laos Railway. The tunnel has to pass through unfavorable geology such as karst, bedding rock, fault fracture zone, gypsum, carbon mudstone, and water inrush, and it varies, thus creating lots of difficulties to the Chinese engineering company, China Railway No. 5 Engineering Group (CREC-5). (Xinhua/Wang Jingqiang)

   Prev 1 2 3  

KEY WORDS:
EXPLORE XINHUANET
010020070750000000000000011100001379124501